We have been waiting for a part for the faucet on the new sink and so have not been able to put it into the bathroom. The part arrived on Saturday and I spent Sunday putting it together. It took all day to get everything hooked up. I'm talking about the faucet here, I haven't got to the drain yet. When I pressurized the system, there were leaks from both hot and cold water lines. Nothing torrential, but I had to shut it down after I tested it. I'll be working on it over the next few days, I suspect.
My other big accomplishment was the shower window. It now has the etched glass effect. The discerning eye will notice that I incorporated the pattern from the wall paper into the window design.
Monday, April 28, 2008
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment