Wednesday, June 27, 2007

Armoire Construction

Susan worked late last night so I did some straightening of my lumber pile and then made dinner so it would be ready when she walked in the door.

After dinner we went upstairs to begin "ARMOIRE CONSTRUCTION".

It did not start well. We didn't have any glue and my Allen Wrenches are not metric. The unit comes with a little Allen Wrench but I thought that two would make it go faster. No such luck!

After a quick dash to the store for Elmer's Glue, we proceeded with the assembly. It took a moment or two to get our bearings and figure out what we were doing. Plus, we had to find all the parts. The various top, side and bottom pieces were not labeled. You had to indentify them by comparing them to the drawing.

We got the main case together and we'll finish up tonight. Then we start the staining.

Tuesday, June 26, 2007

Down Time

With the Summer Solstice Party successfully behind us, we are enjoying a few days to inactivity before we dive into remodeling the bathroom.

We have some friends showing up briefly next week and decided that having the bathroom gutted would not be the best way of saying, "Welcome! Come on in. Watch out for nails and loose boards. If ya gotta go, just pee down that hole."

So we are passing the time by doing little things. Last night, I started cleaning up the big pile of lumber in the back yard. I'm going to cut it into smaller lumber and then throw it in the fireplace this winter.

Later in the evening, we started a batch of wine.

Tonight, I will continue with my lumbering efforts and then we are going to put an armoire together that we bought several months ago at the unfinished furniture store. It's in a large, heavy box and needs to be totally assembled, then stained. We put off doing any of this because it was easier to have the box in our way than an unstained armoire. Now that we are finished with the bedroom, we can figure out the color of stain to apply.

So we will continue with our little projects for a few days and after Independance Day, the bathroom will fall.

By the way, if you were wondering how the Summer Solstice Party was, below is a picture of me taken about 1:30 on Sunday Morning. I think it says it all!

Friday, June 22, 2007

...And the Livin' is Easy!

The Summer Solstice has commenced so now it is time to get down to Summering.

My Annual Summer Solstice Party is Saturday. The deck isn't really in shape to receive a party. It needs to be painted which will not happen before Saturday. I spent last evening doing some wiring. I put five can light into the soffet where the new roof extension is. It went well but I tore the crap out of my fingers in the process. That outdoor wire is really difficult to strip.

But, I must have done something right because the lights came on and the house did not burn down . . . yet!


I must say that I am pleased with my method of routing the power up to the lights. I used the existing wiring that powered a spot light on the deck and channeled it up through the dead bug encrusted soffet and over to the new lights. I put 60 watt bulbs in each can, and boy is it ever bright. I'm going to buy some lower wattage bulbs today. Depending on how that works, I may consider installing a dimmer switch.

Monday, June 18, 2007

Raining from Above and Below on the Homeless

It was a cloudy Sunday that threatened to drop rain all day. That seemed as good a day as any to do some Power Washing on the deck. I mean, if I'm going to get wet, I might as well really go for it. I started about 11:00 and I finished up at 4:00. You would think I could do it faster than that considering how most of the paint was hanging on by a single paint molecule. But some of it was rather stubborn. Plus, I stopped a lot to have a refreshing sip of beer or tell homeless people they could rake my yard. By the time I was finished, I was soaked and covered in white flecks of former paint. As time passed after I finished, I realized how sore I was too. It's hard to hold that wand for all that time.

Anyway, it all worked out beautifully as referenced by the picture below.

Clearly, I still have some scraping to do, followed by sanding, re-scaping, more sanding and then some painting. I also have a nasty rotten spot on one board. You can see it in that dark spot at the top of the second board. I'm hoping there is an easy way to replace it. I have a couple of ideas but I don't know how it will effect the structural integrity of...well...everything.

Back to Homeless People.

At one point, I took a break. I grabbed a beer and walked across the street to the park to sit on the Hyslop Bench and take in the neighborhood. As I crossed the street, I noticed a bicyclist turn the corner at the end of the block and slowly ride up the street towards me. She was riding slowly and looking the houses over pretty closely, as if casing them.

I continued out to the park, sat on the bench, keeping a surrepticious eye on her when she stopped in front on the house and went up to the door. Since Susan was gone with her sister and I was across the street, I had little doubt that anyone would be opening the door.

But I decided to see what was going on and started walking over. As I approached I realized that she was a He. Long curly hair cascaded around his spacey stare.

I said, "Hi, I live here. Can I help you?" A fatal mistake. It turns out that I could help him.

His name was Brian and he began to tell me his hard luck tale of Woe. He needed some money to hold him over for a couple of days and wondered if he could do some yardwork for me. While I was impressed with his initiative, it was at that point that I realized he was riding down the street, looking at houses, stopping only when he came to a place that looked like it needed some yardwork done.

In my defense, all I can say is that this is not the Year of the Yard. We have lots of work to do out there, but for now, I keep it watered, mowed, raked and free of dandilions. Beyond that, the Yard is the Yard.

I told Brian that I would pay him $20.00 to rake out the beds and pull the weeds in front of the house. I figured that was fair for a couple of hours of work that I didn't really need done.

I got out the tools he needed and then I went back to work on the power washing. I had been working for about 45 minutes when Brian appeared. I climbed down from the ladder and he told me he was feeling kind of queasy and needed to quit. He seemed earnest and really wanted to return to finish the job the next day. I gave him $10.00 and told him he would get the rest when he finished.

I kind of doubt I'll see him again but he did get everything raked up into little piles. He even got a couple of the little piles into the garbage can before the queasiness kicked in. Perhaps he is allergic to work.

We shall see what developes from this.

Friday, June 15, 2007

Before & After

I'm very big on before and after pictures so here's a big one of our first finished project in about two years.


I cannot for the life of me, figure out why this picture is coming in so poorly. I tried re-uploading it several times in various resolutions and it always looks like this.

Oh well, you get the idea!

Thursday, June 14, 2007

Nothing to Say

I have been on such a great roll lately with posting to this site that it seems a shame to let a day go by without some sort of report. Almost as big a shame as wasting somebody's time to read this.

Wednesday, June 13, 2007

Prepping for a Sister Visit

We have been on a mad cleaning jag for the last few days in preparation for a weeklong visit from Susan's sister, Margaret. Well, Susan has been on the "jag". I have been trying to do little touch up projects and get the bedroom and landing finished. There are still a few things to do but they are minute and it is going along nicely.

Margaret arrives Friday so we still have a couple of days to get everything done. I think we are doing fine but Susan seems to disagree. However, we also have a continuing disagreement on the definition of "clean".

Because I am just doing small touch up and clean up jobs, I am officially declaring that the Landing and Master Bedroom Project is complete.

Next we will be tackling the upstairs bathroom but that will not start for a couple of weeks.

Monday, June 11, 2007

Approaching the Finish Line

It was a long and busy weekend with many accomplishments to talk about.

Friday, my niece Samantha graduated from High School. She attended a small Christian Academy and there were se7en graduates. The whole family went to dinner and then the two and a half hour graduation ceremony. It was a little long.

We got home around ten and that pretty much was the end of the day for us.

Saturday was our annual neighborhood yard sale. This was the third one that we took part in and it was pretty successful for us. We made just south of $100.00 and got rid of a lot of crap.

What we had left over went to Goodwill on Sunday Morning and what they wouldn't take went to the Dump.

Then Susan went into "Operation: Massive Cleaning" in preparation for a visit from her sister, who is coming for a week from Iowa.

To keep out of her way, I went to work on the Landing and Bedroom doing all the little finishing touches. I wanted to be sleeping in our new bedroom on Sunday night and I was not going to be deterred by anything.







There were lots of things that tried to deter me. I was four feet short of baseboard for the bedroom. I ran out of nails for my airgun in the middle of putting in the baseboards. I ran out of beer. However, you can see from the pictures that I prevailed.
So now, we have just minor items to take care of. Most of those items involve the trim and some touch up painting. My plan is to take care of that tonight and then be able to help with Susan's "Operation: Massive Cleaning".

Friday, June 08, 2007

Working Out & Finishing Touches




Last nights' activities involved the installation of baseboards in the Landing area. Since I am not a professional, it required a great deal of effort and ciphering on my part to accomplish this arduous task.
I placed the chop saw down on the front porch because I didn't want to create a mess on the landing or risk scratching the new finish. So for every board I placed, I had to measure it and then put it in place to make sure it fit. Then, when it didn't fit, I had to run downstairs, re-cut it, run back up the stairs and then place it again.
I figure that for every board, I had to cut it three or four times. With 17 pieces, that means that I went up and down the stairs a minimum of 51 times.
I had been upset with myself for not having run lately. If I have any more nights like this, I should ripped in no time.
Everything is on schedule and I am still planning on moving furniture on Sunday.

Thursday, June 07, 2007

The Home Stretch

The floors on the second floor Landing and Master Bedroom are now complete. They are not perfect, but they are one helluva lot better than they were. I am happy!

With any luck, we will be sleeping in the new bedroom on Saturday Night. Actually, no! That would be pushing it. Let's say Sunday Night.

In order for that to happen, we need some smooth sailing for the next three days. That means that the baseboard installation in both rooms needs to go well. The touch up painting on the walls in both rooms needs to go well. The Neighborhood Yard Sale on Saturday needs to go very well and then be ignored in the afternoon.

With precision timing, steely nervousness and some luck, I think we can make it all happen.

Wednesday, June 06, 2007

Stage C, Part B

It took us just over an hour last night to lay down another coat of varnish. Tonight will be the last coat. Then it needs about three days to completely dry before we start putting furniture on the floor. During that time, we have some minor touch up painting on the walls and the baseboard can be installed.

We have noticed two spots where there are glaring gouges that we missed when we filled with wood putty. One is right in the center of the landing floor. It's going to be covered by a carpet but we can't believe that we both missed such an obvious repair spot. The other spot is in the bedroom, right at the door. it is less obvious. It's more of a waviness in the floor, presumably caused by sanding. It just didn't stand out when the floor was naked.

It seems odd after two years to consider the possibility that this project is almost over. And yet, I'm willing to consider it!

Tuesday, June 05, 2007

Reflections on Polly (polyurothane)

With Stage Two (the Staining) out of the way, we were able to proceed with Stage C (the Varnishing) last night.

The whole project took us about two hours. Most of that time was spent preparing the floors. That involved a good thorough vaccuuming, followed by wiping the whole thing down with tack cloths.

To apply the varnish, we used lambswool pads on a mop pole. We started together but it went so fast that we ended up with Susan doing the application while I looked on and drank beer.

Actually, I had to mix up each quart can of polyurothane we had. We had purchased quarts because "the Depot" had a sale on them which made it cheaper to buy quarts than gallons. What we didn't consider is having to mix up a quart every 10 minutes. There's a thick goo at the bottom that must be extensively mixed in as thoroughly as possible. We used a gallon for the first coat.

With all the imperfections (Character) in this floor, I am very happy with the result. We have two more coats to put down which means two more nights of sleeping on an inflatable mattress in the Living Room.

The pictures I took don't do justice to how good the floor looks. However, here is one anyway. The urothane is still wet so it looks much more glossy than the satin finish it dries to. I like this picture because I have never seen this floor reflect anything!

Monday, June 04, 2007

The Adventures of Susan & Stan the Stainers

Both Susan and I had to work at our various and assorted extra jobs on Saturday. So not much was accomplished by us during the day. However, we got ourselves geared up to stain on Saturday night. It took us about two hours to get through 500 square feet of staining.

We got up the next morning and I was not very happy with the results of our first coat. We had some repairs to do before we put down another coat. The repairs required using the belt sander to remove blemishes, paint drops, and over flowing wood putty.

Once we fixed the boo-boos, we went to work putting down the second coat. This we did in much less than two hours and I was much happier with the results. The picture above shows the bedroom half way between coats one and two. I could almost argue for another coat, but that might make it too dark and then we would have to start over. The photograph below shows one of the repair areas.






The second coat filled the whole house with fumes so we left for a little bit and went to ArtFest. ArtFest is annual event held in a park with lots of artsy craft venders. I actually made a purchase of a hanging hammock, which I intend to enjoy on the back deck. Some day!

When we returned, we found the house still full of fumes (don't light a match) and the floor still kind of tacky. We had hoped to put down a coat of Polyurothane before the end of the night but that was not to be.

So, that is our goal for tonight. Get down a coat of Urothane. Then, we have to completely block off access to the upstairs from the cats and ourselves and sleep on an inflatable mattress in the living room.
Tune in to our next episode to see how we do.

Friday, June 01, 2007

Stage One Complete

The final sanding went smoothly. Get it! Sanding?! Smooth! Golly, I'm good!

We had a slight problem. The wood putty was somewhat resistant to the fine grit sand paper I was using and I didn't see fit to purchase any of the heavier grit paper.
So, Susan went off to "the Depot" while I continued sanding with the one sheet of 60 grit paper we had. I manged to get the bedroom completed while she was gone and got started on the repair section pictured below. That was the most difficult area to sand away as we had completely coated that area.







I think it looks pretty good and once it's stained and covered with a rug, it'll look fabulous.

Thursday, May 31, 2007

5,000 Words Lost Forever

I left my camera at work last night so I was unable to photograph any of the progress we made towards finishing the landing and bedroom. I mean, if a picture is worth a thousand words and I could have taken just four or five crummy little pictures last night, I wouldn't have to be writing all this stuff now.

Actually, we didn't make that much progress last night. In order to complete this project in a timely manner, we are now on a schedule. Also, we really want this to be done and getting to this point, it's exciting to realize we are almost home.

I am hoping to have the first coat of Polyeurothane on the floor by Sunday night. In order for that to happen, a tightly choreographed series of events must take place at just the right time.

Last night, I did some minor repairs to a couple places on the floor. Susan did some touch up painting. We also decided that if we are going to put up Crown Moulding in the Landing area, it would be best to do it now while the floor is still un-stained. So, I painted the Crown Moulding out on the front porch and brought it in this morning. I'm having Phil install it this afternoon.

I'm renting the sander on my way home from work tonight and will do the final sanding. Then we have to get everything cleaned back up and ready for the staining.

This would have been so much better with pictures.

Wednesday, May 30, 2007

Filling the Gorges

We had a fairly easy night of work last night. We set about the task of filling the gaps, gouges and small canyons that is the landscape of our floor. The worst part of the floor is this 10 foot by 4 foot section I had to totally replace. You can see from the picture that we pretty much trowled putty into the whole area. I'll be taking lots of detailed pictures of this section as we progress to see its transformation. Fortunately, this area will be covered by a bookcase and a rug and anything else we can throw over it.

Tuesday, May 29, 2007

$550.00

We spent some money this weekend. Another way to look at it is we saved a lot more money than we spent. I have had people tell me that re-finishing a floor costs about $6.00 a square foot. That would be $3,000.00 for the approximately 500 square feet we worked on this weekend.

Of course, we're not done yet. We still have a few supplies to buy. But let's take a look at what we did!




















I would say we done good! The floors are not perfect. You can see in the after picture that section on the left that looks substantially different the the rest of the floor. That's the area I had to patch because it used to be a closet. The wood I used has a different grain to it and there is just no getting around the fact that it will not be a close match.

However, we plan to use a fairly dark stain which will help to hide the difference as well as all the other imperfections in the old wood floor.

The main thing is that we have gotten it done. Here's a good before and after shot of the crew, Mark, Susan & Stan.

Monday, May 28, 2007

Knee Deep in Sanding

We spent Saturday prepping everything for the arrival of the big floor sander. I rented an edge sander and finished all the edges. Below is a picture of the Alto-Clarke SR-7 Edge Sander and an example of what it does. I had to finish off that little corner piece with my belt sander.



I went to Home Depot bright and early on Sunday and got the sander. My friend Mark accompanied me because he just refinished his floors last year and was familiar with what we needed to get and do.

We ended up returning the sander almost immediately because we couldn't get it to start. It had a short or something in the electrical system. When we got it back to the Depot, it ran fine. The guy suggested that it might be a power problem on my end. I told him I had new wiring with 20 amp breakers which he agreed should be okay.

We swapped out sanders, he re-set the time, and we were off again. This time, the sander operated within normal operational sanding protocols.

So, our early start and subsequent stalls had me sanding the floors by 1:00PM.

We realized almost immediately that we would have to put down some stripper first to get the best result.

Susan dashed to the Depot while Mark and I continued working.

As of today, the bedroom is entirely stripped and ready for sanding. We are all very sore. Susan and Mark will continue stripping the remaining portion of the floors while I rip into the sander.

We hope to have everything sanded by the end of the day.

Well, enough of this blogging. I have work to do.

Saturday, May 26, 2007

Countdown to Sanding

We are really zooming ahead now. We have accomplished a lot this week and I attribute our efficiency and speed to one thing. The end of the Network Television Season. Now that all our favorite shows are into re-runs, we have stopped watching TV and concentrated on getting this project done.

As of now, Saturday morning, we are planning on sanding the floors tomorrow. We are going to spend the day completing little touch up projects we need to do before the sand starts flying. I will get the sander this afternoon and we will be ready first thing in the morning.

We still have a lot of nails and staples to get out of the floor. Everytime I think I have gotten them all, I find more. When they carpeted up here, they didn't waste any expense on nails and staples. That carpet was NOT going to get away.

I am getting very excited for this to be over. I can't wait to see this floor with a fresh coat of stain and varnish. I think it will completely change the look of the whole room.

And then Susan won't like the color of the walls.

Friday, May 25, 2007

Painting Painting Painting

There's a good early morning shot of the landing with its new coats of paint. Susan still isn't quite happy with the color. She wanted something in a biege tone and this looks more yellow. I don't care one way or the other. The main thing is that it is complete...and we are not changing it. Now we have just a little touch up and then the sander comes out and we do that floor.

There I am on top of my $400.00 ladder with my $19.95 Wagner Power Pump Roller preparing to paint the walls with my $100.00 bucket of paint.

Not that I'm counting. No, wait! I am counting. That's why I'm writing this blog. To count and account of wazzup!



Thursday, May 24, 2007

Painting Change Order

Well, I had the first coat up on about three quarters of the landing when Susan decided that she didn't like the color. It was too yellow. We bought the paint several months ago and before we started, Susan thought it was too light. So we trundled it back to "the Depot" and had them re-tint it.

Once she realized that it was now too yellow, we decided that we will buy a new bucket and start over. That's much cheaper than having her agonize over the color being wrong for the next several months until she decides to change it.

So, we went to work putting up Cincinnatian Hotel Dominica, which is a much lighter, mellower yellow, as you can see in the picture above.

Last night, I had to do some of the edging in the stairway. That requires getting waaaaay up high on the ladder in very precarious positions. I got all my edges painted when Susan realized that I had grabbed the wrong paint. She had poured a small container of the Way-Too-Yellow paint and I thought it was all the new paint.

I thought it was going down kind of dark but I just figured it would match up when it dried.

The Comedy of Errors continues.

Friday, May 18, 2007

A Friday in May

This entry is going to be a progressive kind of affair. I have taken the day off of work in order to accomplish some tasks around the house.

I have already gotten up and got in a two mile run around the park. In a moment, I shall shower and then begin the day in earnest.

We shall start with a series of pictures of the landing.

The picture at bottom is what we accomplished last night. It looks like it is going to need at least one other coat, but it looks pretty good.

Okay on to the next task.

5:32PM I managed to make three trips out to the dump today. While I am happy with the amount of crap I hauled away, I still have a ton of crap to remove. And I think a ton is an actual factual amount. I have a lot of clean up work yet to do with this little area at the back corner of our property. It seems the previous owner has used it to dump leaves and grass clippings for a loooooooong time. As a result, there is a very nice composted mulch back there that is littered with chestnuts from the yard. It's going to take me a while to get it all out of there.

Once again, I have bitten into a project that is a LOT more to chew than originally anticipated.

I think I'll go make some beer.

Monday, May 14, 2007

Another Task Crossed Off the List

The master bedroom ceiling is complete. It took us a total of about se7en hours to apply ten 18 foot panels of wall paper. Broken down, it was two hours on Tuesday, two hours on Thursday and about three hours yesterday. We had to do a little bit of minor repair work to a few seams, but for the most part, we are pleased with the results.

Now we have to get up some crown molding to hide the wavy edges and we are finished with the bedroom...except for the floor.

The only other major task to complete now is painting the walls in the landing.
and then the floors.

In other project developments, we started some work on the deck. We had a wheelchair ramp attached to the deck when we moved in. It has been great to have when it came to moving large, unweildy appliances and/or furnitures into the house.

But it takes up a three foot swath of lawn space in an already small backyard.


Friday, May 11, 2007

Half Way to Hell

Wallpapering a ceiling is no picnic. I think it would be the perfect torture treatment for Enemy Combatants. You put them in a room with a 13 foot ceiling, that's textured, and about 120 feet square. I think by the time they got the first panel up, they would want to start talking.

We achieved our goal of three panels in place last night but it was not fun. For some reason, we had a hell of a time getting the first panel lined up properly. By the time we got it up, my arms felt like lead weights.

But, we are half way across the room now and plan to finish up on Sunday.

In an unrelated developement, I shut down the furnace yesterday. Next I will drain the radiators and begin the process of removing the last two upstairs so they can be painted.

Thursday, May 10, 2007

Purchases & Progress

This past Sunday, we bought a bookcase for the landing. We have been looking for a while and did not have much luck finding one that we liked enough to pay that much for. Susan was in a local Discount Mart and found a really nice one for $100.00. It was a Merchandise Return to Costco. It has some damage. There's a crack in the woodwork on the spacer between the two sides. We think we can fix it.


That remains to be seen.

Tuesday we started wall-papering the ceiling in the Master Bedroom. We managed to put up two panels of paper. Considering the amount of time it takes to get everything in place just so you can do the work, and then the Comedy of Errors in figuring out what you're doing on the first panel, completing two panels is great progress.
Tonight we are shooting for three panels. That's the halfway point.

STAND BACK! Something momentous is about to happen.

I am setting a goal!

The Landing and Bedroom project (which extends to the stairway project) will be completed by Wednesday, June 20th. That is five weeks and 6 days away.

The Word for the Day is atribilious. Ill-tempered, grumpy, melancholy.

Friday, April 27, 2007

Construction Material

When working on a project, no matter what it is, I have found that the most important accessory you can carry with you is a good cold beer. Being a home brewer, I prefer whatever it is I have in the keg. Today, it is SJB2 Honey&Spice Beer. It is one of my favorite recipes and is one of the beers on which I regularly get good reviews from friends.

I am writing about it now because, after many weeks, I finally have this beer pressurized to the right amount. It has been waaaay too foamy and it requires several days of fidgeting with the pressure to get the balance correct. One must also sample the results of the fidgeting and then fidget some more to make the required adjustamencations.

Anyway, the result is this nearly perfect pour which I offer in photographic evidence. Now all I need is a project to work on. Fortunately, there are plenty of those.

Monday, April 16, 2007

Finish Work 01



Now that we are getting down to the Finishing Work of our project, we spent a few days trying to decide how exactly to proceed. We are down to painting the walls, wallpapering the bedroon ceiling and sanding the floor. After that, it's trim work, touch up and we're done.

We didn't know whether we should sand the floors first or paint first. If we sand first, then we don't get all that sanding dust covering the newly painted walls. If we paint first, then we can be sloppy about the painting, letting stuff drip and drizzle where it may, and then wipe down the walls with a vaccuum and tack clothe after the sanding.

We chose the latter and I think it was the right choice.

We began painting the bedroom yesterday and it looks great! I'm going to get the second coat up tonight and in the next couple of days while Susan works on some of the wood trim around the doors.

In the meantime, I have posted some pictures that show a progression of one of the bedroom corners.
We've come a loooooong way, Baby!

Sunday, March 18, 2007

Spindles, Ballusters, & Rails



What a difference a Spindle makes. I'm not going to say much and let the pictures do the talking.

I guess I should point out that I combined three pictures into a low resolution file that pretty mush looks like crap. Let me see if I can add one good looking high rez photo.


Ah, that's better. Now I have to get back to work!

Wednesday, March 14, 2007

Staircase Update

We made some significant progress last night and all we really did was get started. But remember, a journey of a thousand staircases begins with but a single stair.

We got the main post into place at the bottom of the stairs. Then, we more or less got the rail into place. We are using the old rail because it is a nice wide, substantial piece of wood that is no longer available in the same style. Because of all the new regulations and codes, stair rails are much thinner in order to allow a hand to securely wrap around it.

With the rail in place, this allowed us to cut and place one of the new balusters. I think they are going to look great.


Tuesday, March 13, 2007

Small Update

I haven't written in a while so I thought I had better get something on here just to keep current.

Work on the house is progressing at a snail like pace but we are very close to starting to sand the floors. That's our next big hurdle and I'm hoping it will go semi-smoothly.

I have been playing Racquetball with my friend Rob for a couple of months now. It is our one little workout regimen. Rob has been regularly beating me since we started playing. He is quite a bit better than me and his stamina is far superior to mine. I'm just soooooo out of shape.

Anyway, I finally beat him yesterday. I thought it was important to get it down with a date in a place where I can refer to it often. . .since it's not likely to happen again soon.

I should also add that I recently turned 50. No presents please!

Sunday, February 11, 2007

Another Accomplishment

At this rate, the house will be finished 40 years after I'm dead.

This weekend, I worked on the Master Bedroom Closet. I found this modular closet system by a company called ClosetMaid. It's a pretty cool set up and I have half the closet done already. I had to go back to Home Depot three times before I got to where I am, but I am happy with my results thus far.

I have a couple more pieces to add and then it will be done. I'm most pleased by the amount of storage space we have in there. I wasn't sure it was going to be as practical and useful as it seems to be turning out. And all for less than $300.00. Of course, my original plan had it costing about $200.00.

Sunday, January 14, 2007

Remodeling Re-Continues Again

It took until the Fourteenth of January but we are finally back to working on the house. Today we did some more priming on the ceiling and walls upstairs and I did some patch work on a nasty hairline crack on the stairway wall. It will be a few more days before the patch is complete. I want to take my time letting the various layers of plaster dry completely before I apply the next layer.

Once the patch is finished and I am satisfied that there are no more little cracks to deal with, we can get the wall primed and ready for painting. This project is dragging on too long. We need to get it done and get on to the next project.

I just did a little blog search and it appears the last time we did any work on the house was back around November 12th. So, if you consider that we only work on the house 10 months out of the year, I think we're doing okay. Susan would disagree.

Monday, January 01, 2007

Happy New Year

It's 2007 and Susan and I rang in the New Year at the Spokane International Airport.

We have just returned from 10 days in beautiful Des Moines, Iowa. Why? Because when you think Christmas, don't you naturally think Des Moines?! Me neither. But that's what we have been doing for the past several years and will keep doing for a few more years to come.

Des Moines is where Susan is from and her Dad, Gordon and Sister, Margaret live there. It has been the only long distance trip we make for the last few years. In the past, we drove. You can get from Spokane to Des Moines in 22 hours and 37 minutes. That's pretty grueling though, driving straight through and changing drivers every 4 hours.

But yesterday's marathon flying session took us all day (Over 13 hours) and we feel about the same amount of fatigue as if we had driven.

Now, to be fair, we only spent a total of six hours in the air. The rest was spent in various airports around the United States, which are lovely facilities to pass through, but who wants to linger there.

We started our day at Des Moines International where we had a civilized departure time of 11:20 AM. We went smoothly through check in and security and the plane left on time.

We knew in advance that we had a three hour layover in Cincinnati. When we arrived, it had turned into a four and half hour layover. This posed a problem for our final connecting flight into Spokaloo. They were able to get us onto a later flight so that seemed to solve that problem.

After many hours of beers and nachos at "Max and Edna's", we made it on board Flight 1541 to Salt Lake City. This was our longest and best part of the trip. We had first class seats, right up in the front row. We were able to recline in spacious comfort, drink copious amounts of alcohol of all kinds and watch a movie, "Scrooged".

When we finally landed in Salt Lake, we had about 40 minutes before our next flight which turned into an hour and a half cuz we don't got no plane.

That earned us a $14.00 food voucher which we spent on "beer and nachos."

When it came time to board, they threw one more monkey into the wrench by informing us that there were possible weather issues in Spokane and we might be landing in Pasco.

Fortunately, the weather cleared and allowed us to land in Spokane and get out of the airport by 11:30. That gave us time to stop by a friends house who was having a New Years party. We were both beat but we wanted to be festive for the New Year. The party must have been moved because when we drove up, Carine's house was dark and there were no cars in the street.

So, we came home and arrived just as everyone within a 200 mile radius found the illegal fireworks they had left over from the Fourth of July. We each enjoyed a shot of Peppermint Schnapps, enjoyed the artillary and went to bed.

May auld acquaintance be forgot...blah blah blah

Friday, December 08, 2006

How to Draw a Holiday Window

After nearly two weeks of painting, we are almost done. As of today, we have two and a half Skywalks left to paint. The half is because I have one skywalk that Susan and Laura have painted snowflakes on but I haven't got any skating figures up yet. I'm going to take care of that tonight.

In the meantime, I thought it would be nice to describe the process of creating beautiful Holiday Window Scenes for fun and profit. Mostly profit!


Start out with a window and some kind of design. When one is painting skywalks, it is not hard to find a window. Suddenly, they are everywhere. You see them in your sleep after a while.

I use tempera paint. That's the water based paint that comes as a powder that you used in Grade School to paint posters and other students. It cleans off very easily with soap and water. But be warned, If your window is exposed to the elements at all, a good rain will really mess up your artwork.

I started this process by free handing my design from a picture, but I found it was much faster to create a large stencil on butcher paper and then trace my figure using a white China Marker...a grease pencil.
This year I found a water based Spray Paint that cleans off as easily as the tempera. I spray the image with paint as evenly as I can and then roller it out to fill in the gaps. Because of the free form style of this particular design, I don't have to worry about staying within the lines. In fact, the over spray adds a nice touch to the design.
Once I've got the whole image filled and it has had time to dry, I come back and hit it with some highlights. It's just a line that I paint down the leading or trailing edge of the image that helps define an arm or leg and makes the image a bit more interesting.
Finally, I outline the image in white. Again, the style of these figures allows me to be inexact with the outline.

Now that I have the system down, I can paint 12 different figures in about three hours. I usually finish before Susan.

So there you have it . . . a complete guide to Holiday Window painting. Don't even think about invading my territory.

Sunday, December 03, 2006

A Reason for my Absence from Blogging

I haven't posted anything here in a while because Susan and I have been busy with another project that has kept us out of the house. . .almost completely for over a week.

As a Starving Artist and Cartoonist, I have always looked for new and different ways for me to express myself in Art and make a buck while doing it. I have been painting Holiday Windows for over 20 years now. It's a great way to make some extra money just at a time of year when I can really use it.

Susan and I have had a deal going with a local Real Estate company for the last few years to paint some Christmas characters on office buildings and one of the skywalks downtown.

This year, my name was referred to the office of the Downtown Spokane Partnership, which is a local booster organization that promotes downtown. There is a big Ice Skating Championship coming up in January and they wanted to promote that in a fun way that would also help decorate up the downtown area.

So they asked us to paint a wintery skating theme in ALL THE DOWNTOWN SKYWALKS. For those keeping track, there are 15 skywalks downtown.

We started painting last Friday, the day after Thanksgiving, and we have been going strong ever since. To date we have completed 11 skywalks. I don't care to divuldge the amount of money we are making in this process other than to say it will be a very Merry Christmas.