Sunday, October 02, 2016

Mo Bathroom

I am not at all pleased with my fix on the bad joint.
My next plan of action is to return to Windsor Plywood and see if I can get a 10 foot length of the trim. If I can get that, I can run the piece in one section and be victorious. Susan is thinking she (the Queen of Spackle) can fix it. I'm going to let her try.

Phil came by today to work on the things I don't want to work on. In this case, it is repairing the roof from last October's wind storm.
I'm getting to it in a timely manner. He was not able to finish because it was too hot. He is trying to feather those pieces in under the existing shingles and the heat was making them soft and rippy.

No comments: