The Crowd O'Carvers
The Pumpkin Carving Award Winners
This Blog is dedicated to the Home Remodeling Project of Stan & Susan Burke. Here we will chronicle our on-going projects as we move toward our goal of finishing some day. Hopefully before we die. If this blog ends suddenly, you'll know we failed!
The Crowd O'Carvers
The Pumpkin Carving Award Winners




Above is my mock up of how this all should look when it's finished. The top of the picture is the front door and the bottom transitions to the hardwood floor. The colors still look a little off compared to the real thing but it's a good enough representation to show what we have planned.


We hauled out the Halloween decorations today and spent a good portion of the day and evening putting them up. I have to stop writing now and continue up putting the remaining decorations, lights, ghost, ghouls, goblins and assorted things that go bump in the night.
I was in it tonight because I wanted to soak and because I had some maintenance issues to deal with. The unit has two "Moto Massage" features that have a hose that shoots a jet of water at your back while moving up and down. It's pretty nice. You can see the one "Moto Massage" unit in the left corner of the tub in the picture above. The other "Moto Massage unit is in the adjacent corner of the tub shown in the picture at the bottom middle. That one does not work. The hose has come uncoupled from its connection. So I donned my Diving Mask and Snorkel and probed the depths of the Hot Tub. I managed to get into the unit and remove the hose but I cannot get it re-attached. It looks like I have to remove the fitting that it attaches to and before I do that, I'm going to get some guidance. Guidance keeps me from doing stupid, expensive things. I am thinking I'll have to drain the tub to properly re-install this dealie but I just don't know yet.
I ended up being in the tub for about 45 minutes. I'll probably still be wrinkled tomorrow.
It seems to be holding as of this morning and I assume it is designed to withstand water pressure in a plumbing system. If it happens to blow off, it could be very ugly for the main floor.
There is a LOT of water in them thar pipes.
I got a call from the company we ordered it from and the lady told me (in a very thick accent) that she was ready to ship. I don't know how long it will take to get here but it is now on the move...I think from Lebanon. I suppose I can cont on at least a couple of weeks. I e-mailed her with that question and have not yet received a response.
Susan worked on the stairs and made some good progress. The stairs have so many nooks and cranny's that you could sand for weeks on end and never seem to each the end. She got to many of the nooks and glossed over the cranny's.
It is a very busy month for us and I cannot see how we are going to fit in everything we need to do. We have already scaled back our Wedding Anniversary Weekend. We normally go to some fairly local Bed and Breakfast (within a few hours travel) and make a weekend of it. But we're still stinging from our Iowa trip so things must be toned down.
I called Jerry who came out to survey the new meter and the associated new pipe we (Jerry) had to install.
He called me yesterday and said it was ready for the new pressure test. I got home last night and powered up the compressor and pressurized the line to about 15 pounds. It seemed to hold for a while but when I checked it this morning, it was down to about three pounds.
So now we (Jerry) have been searching for a leak. We (Jerry) found several small ones in the pipe that I (Me) had nothing to do with. By that I mean the already existing pipe in the house leading from my point of repair to the furnace valve.
We (Jerry) are now in the process of removing all that pipe and resealing the joints. Right now, as I type, we (Jerry) is fetching a new valve because it was leaking as well as the joints. We (Jerry) will then reinstall all the pipe and joints and pressurize the line again.
Our Syrah won Second Place and the label I made won a Blue Ribbon with a Judge's Special Distinction Ribbon. I'm not sure what that means but what I DO know is that the Blue Ribbon Susan won for her label on Ellen's Third Place Syrah did NOT get a Judge's Special Distinction Ribbon. And so I'm pretty cocky about that! This is Susan's label.
Our Summer Solstice Piesporter received a Blue Ribbon with a Judge's Special Distinction Award. I was very surprised by that as our decision to enter that wine was an afterthought since we were entering the Syrah. The picture below is my Syrah Label. If it looks like I whipped it up in about ten minutes with a Sharpie, that's about right.
My experimentation into new brewing boundaries was not accepted by the "conventional wisdom" of the apparatchik. They clearly were not prepared for something as revolutionary in the brewing industry as PorterMeister, a dark rich porter with the lush licorice flavoring only a bottle of Jagermeister could provide. For my efforts, I received a Participation Ribbon. That's like getting a Gold Star for showing up to school on time.This year I had grander expectations. I had really worked at crafting a beer that was different. I made a porter that is supposed to have a licorice flavor to it. I chose to add Jagermeister for the licorice flavoring. I liked it but nobody else did. No ribbons for beer this year.
In the wine category, we entered a Piesporter and we entered a Syrah. The Piesporter was a wine we made for our Summer Solstice Party so it has been in the bottle for a while and has aged properly. In fact, it aged really well because we got a Blue Effing Ribbon with a Special Judges Distinction Ribbon AND A TROPHY!!!
Okay, calm down. Simmer Down now!
Our other wine entry, the Syrah was also a kit wine and identical to the wine entered by our friend Ellen. Ellen had the advantage of a couple of months of bottle time over us but we fermented our batch in bulk for a while which I think made the difference. Ellen got a Third Place Ribbon and we scored a SECOND.
We also got ribbons for our labels but I don't remember the ranking. The dealio with the labels was that Susan made the label for Ellen's wine and I made the label for our wine. I believe I beat Susan but again, I can't really remember and I'm not the kind of person who keeps those kinds of records. (The Sarcasm meter just went off the Charts)
The thing that really amazes me is that I forgot to take any pictures. I had my camera with me and it totally slipped my mind that perhaps I ought to be clicking away. It's the thrill of competition that makes think unclear.
Pictures to follow next week after we pick up our wineses.
We were wrong. No old door frame was to be found. However, that little detail did not deter us. We wanted a door in that wall and now, we have one.
I am so pleased with how this turned out. It really changes the feel of the entryway. We used Phil on this project because, Number One, we wanted it done right and Number B, we wanted it done fast.
Phil managed to do both things. Next up, Tile Floors!
I already said this but I'm too lazy to re-write. I will not be able to finish the floor today because it is intense with Labra Dor Day activities. We are paddling the Little Spokane river this morning and attending the Labra Dor Concert in Colmstock Park this afternoon. There also exists the distinct possibility of a rain out of the paddling AND the concert. The day looks tentative. Which then means I could work on the floor and everything here that I didn't delete is now without purpose...or merit...or any sense of reason, or rhyme or STOP ME!
We again attended the Pigout in the Park because we were so disappointed with our food choices on Friday. Last night, we did much better. I had the giant Italian Sausage and Susan had the Philly Cheese steak.I was also able to add Chocolate Dipped Cheesecake on a Stick to my resume.
I needed a new chisel. I had pretty much beaten the crap out of the cheap "Made in China" chisels I have. I was determined to buy one the says "Made in U.S.A." on the package. That is easier said than done.
I ended up being successful but I didn't get the exact type of chisel I wanted. It's a masonry chisel but it is solid and forged out of American Steel. I worked pretty well.
On a final note, the following video is for anyone contemplating visiting our house late at night without our permission.
There was of course, wine and food to be consumed. We listened to the Jazz station and watched birds and bats and fish had a wonderful evening under the full moon.
This is one of the many reasons why I love Spokane.
We have ordered the tile for the entryway. This was not an easy process. I can't order from their website. Everytime I try to log into their "Live Chat" feature, they are off line. So I called thier Toll Free number. Got a message machine. I called the other Toll Free number, got the same message machine. So I left a message and waited for them to call me on my cell phone.
This is a sample of how it will look except that, for some reason, it's coming in as a negative. The colors are much prettier than what this shows. It's got lots of green and yellows and creams. We should have it in about three weeks. It would have been judicious of us to order it three weeks ago, but that's not how we roll.
The door to this room used to be where the flooring transitioned. But somewhere along the way, probably when the house was transformed into two apartments, they moved the door and built a closet and a linen closet.Well, we like the closets and so we are keeping them. But we need to make the floor look consistent.
So, just like the other day (but without John) I cut into the flooring where I want to remove it. Then I began the task of prying up the boards. I didn't have to be quite so gentle this time because I wasn't planning on saving these boards. It would have been nice to save them but not imperative.
That was lucky because saving them was not to be. For some unknown reason, someone went under the house and screwed a row of screws through the underlying floor and into these boards. That made it very difficult to remove them in tact.
I can only surmise that these floor boards came loose at some point and the fix was to fasten them down with screws from underneath.
So after only a couple of hours, this is the progress we made. The main thing is that we did something rather than sit around and watch TV like we usually do.
One other note of importance; we ordered a door yesterday to place in the entryway that will be an alternate entry into this room. One may recall that we thought there would have been a door into this room originally, but apparently people from 100 years ago don't think like us!
Here is John doing all my work. I love him for that
In this picture, I have removed a few more boards and the view shows the repair area I will have to deal with.
Here is a picture of the entryway cleared of the hardwood flooring. This is the area where the tile will be placed.
Here is a shot of the repair area after I have chiseled away the damaged boards.
Okay, from here, I have to patch this section of floor. I tried a couple of plans but they didn't work so well for me. I finally ended up taking a long piece and just hammering it into place. Then I hammered another piece into place next to it in the shorter span. it worked well and they are a tight fit. I'm rather pleased with myself. However, the last time I was pleased with myself, I followed by cutting into a gas line...so, not really so smug.
Nothing major, actually. We just want to experiment with some subtle striping highlights around the columns. It's the type of thing that probably only we would notice. Something else I just noticed is the damn telephone cord hanging in the background of the mailbox. Whoever the Moron was who strung the telephone many years ago didn't give a crap about pieces of resistance.
It's not that I am just now discovering this. I knew it was there. I just don't know what to do about it right now. When we remodel that room where that phone line goes to, I will do it properly through the underbelly of the house. In the meantime, I am forced to live with that wire as is, mocking me and preventing me from completing our flawless front porch perfection.
It is tough to be a Prima Dona!
In the meantime, I had to get the system drained so I placed the hose in a five gallon bucket and began hauling buckets into the yard. I will bet you I dumped 100 gallons. I guess that shouldn't surprise me when you consider there are nine radiators tied into the systems along with all that pipe. It seems much larger when you have to haul it.
That was an excellent meal.
Finally, I would like to say that I had no reason to be fearful of the squirrels NOT finding the new feeder. The had no trouble at all. I haven't seen them use it yet but it gets emptied every day so I'm pretty sure they found it. I'll probably see it in use tomorrow. Pictures to follow.
So now I will just wait and see how long it takes them to figure it out.